Sunday 23 September 2012

Argh... I need a break from wedding admin.

I stole an hour today nipped to the workshop and made a list.  It made a pleasant change.  From making lists.

Here's the fabrication that's outstanding:

  • Crotch strap mounts - I know what I'm doing here and have ordered the steel.
  • Complete exhaust mount - I have a plan, have the steel; just need to think about exhaust position again.
  • Weld-in body support bobbin on the driver's side.
  • Weld in body mount tab on the PAX side - perhaps use a modified water-jet tab that I already have.
  • Weld in exhaust lockwire tab.  A what?  I'll explain another time.
  • Front ARB mounts - need to be 'adjustable' i.e. multi-position.
  • Rear ARB mounts.
  • Prop Centre Bearing Mount - still not bought prop - next purchase.
  • Finish Prop Catcher.
  • Clutch Pedal Stop
  • Hand Brake Cable Bracket - have the basis of this but needs sand blasting.
  • Finish undertray tabs.
  • Bonnet catch tabs.
  • Rear tub mounts - need to contact Gemini builders to see what they did.
Kate and I are only planning a mini-moon so I may even get a day to work through some of these w/c 1st Oct.

In the mean time, wish us luck!

TC

1 comment:

Tim said...

Ah... and almost forgot - earth points!