A blog that chronicles my adventures building, owning, fettling and racing various kit cars.
Saturday, 5 April 2014
Friday, 28 March 2014
Seen it all before...
The RGB season kicks-off this weekend which is depressing. Yet again I have no car. The progress made has been to finish some stuff that has been WIP for ages.
Rear Loom:
Airbox:
The plan is maybe to upgrade the standard JC50 filter to a proper box-lid at some point, but that's another £400 project so this will certainly do for now. Noise will likely determine if I need to change things.
I'm trying to keep the bonnet bulge as small as possible. I'm conscious that I'm used to driving cars with cycle-wings and seeing as much of the road as possible is important to me.
TC
Rear Loom:
Airbox:
The plan is maybe to upgrade the standard JC50 filter to a proper box-lid at some point, but that's another £400 project so this will certainly do for now. Noise will likely determine if I need to change things.
I'm trying to keep the bonnet bulge as small as possible. I'm conscious that I'm used to driving cars with cycle-wings and seeing as much of the road as possible is important to me.
TC
Sunday, 9 March 2014
I-loom-inating
The rear loom (mainly running lights) is very nearly complete:
TC
I've used splash-proof connectors - some genuine AMP, some not-so-much i.e. evidently not quite so good quality.
The free plug 'by-yer' is for the rain light. I'd have completely finished the rear loom if it weren't for the crimp connectors that I've bought for the earths. Lord-knows how you are supposed to crimp them; they are so stiff - it feels like my fingers might break before they bend.
Next stop: wiring in and around the cockpit.TC
Saturday, 8 March 2014
Pipe Down
(Almost) first-thing this morning I headed over to see Andrew Graham at http://www.allisport.com/. He did a fine job of welding the AN8 fitting to my oil cooler take-off. He's all of 15 minutes from home so definitely and option for my tanks etc.
It's budget time in work so I spent the rest of the morning and early afternoon modelling labour costs. I was relieved to finish and having met the delivery driver from Tesco at the top of the drive - they don't fancy the incline much - I wandered out to the sheds to do a bit.
With the take-off plate torqued-up, I was able to finish the oil hoses. It's worked out quite well albeit that it's quite tight where the hoses move up-and-forward to the cooler itself. I may need to use some heat resistant material to protect the oil lines, including the pressure sender take-off line.
While I was messing about with bowls of hot water and rubber hoses I thought I'd have a go at the flexible fuel lines at the rear. This was a tougher job than I and anticipated and even having warmed the hoses it was a struggle. For the second hose, where it connects to the hard pipe that runs down the tunnel, I actually smeared a little vaseline on the copper to help the rubber to slip over the ferule that is acting as a bead. The proper stainless clips (these arrived in the week) then fitted over very well.
I'll need some tanks to finish the job.TC
Saturday, 22 February 2014
Correctly Sized Suspenders
The temporary springs have been replaced with the correct items from Faulkner. Also seen in this photo is the near-side bracket for the rear ARB, This side is all bolted-up tight. The bolt for the top shock-mount is a bit long but life is too short.
The springs all needed compressing slightly to fit onto the dampers. I don't own any suitable tools so I achieved this by putting my considerable weight on the spring (who would have thought that 'planking' had a practical use?) while Kate clipped the collar into place.
On the front the top mounts are tight but I need to get the ARB offset spacers plated before the lower bolts meet their attachments.
I'm sure that it shouldn't but this lot took me most of the day - with a brief break to watch some rugby. Oh well.
TC
Sunday, 9 February 2014
Lube Tube
I'm again struggling to devote much time to the poor ol' Gemini. I have managed to finish one of the oil lines - having expected to buy steel push on fittings from Merlin, I found that aluminium fittings from Hong Kong were 30% cheaper. I can't really argue with that. Everything is in customary black - continuing the attempt to make the car look as 'factory' as possible.
The hose was heated-up in a boiling pan before pushing the fittings on. I've then added some adhesive-lined heatshrink to finish-off the factory appearance and to possibly add a tiny bit of extra security.
I've got one end of the second hose still to do but need to get a fitting ali-welded to the take-off plate before I finally size it up.
Other work included running the cables for the brake light switch - I've experimented with self-amalgamating tape here as I intend to use it elsewhere. This cable runs behind the fuel tank and I can't put base-fixings in a couple of spots so I plan to glue the cable in place with acrylic - I just need to pick-up some plastic quick-clamps to keep it in place while it cures.
The final little bit of progress made was to rivet some cable tie bases to the rear frame to then carry the wiring for the rear lights.
T-t-t-t-t-that's all folks.
Sunday, 2 February 2014
ID on the PCIII
Before I stuck some velcro to the bottom of my Power Commander to hold it in place, I thought I should photograph the Serial Number - without checking, I'm sure that the RGB regs require this. If I put it here I don't lose it.
I've done a bit more wiring, the hoses to the oil cooler are work-in-progress AND I've actually finished the carbon gearchange shaft.
I really need to get it on a ramp to get access underneath. Hmm.
TC
Subscribe to:
Posts (Atom)