Sunday, 27 November 2011

Whining and grinding.

To be honest I've been a bit troubled of late.  On the one hand I've been looking at the spreadsheet that I've constructed to estimate the cost of the build.  On the other hand I've been looking at the cost of our wedding.  Kate and I are very fortunate that we both have good jobs and earn decent money.  However the car and the wedding are both significant projects and I'd started to fret.  What brings the issue into stark contrast is the availability of race-ready machinery at a fraction of the build cost.  The sensible thing would undoubtedly be to go out and buy one of these cars and get back to racing - something which I'm now missing more than ever.

However, the fact remains, I intend to complete one build and I've come a long way and invested a lot of cash already.  So, having flirted with the idea of either moth-balling the Gemini or even selling up and buying some turn-key solution, I've resolved to carry on. Thankfully the future Mrs C is hugely supportive, if probably fed-up of me talking about cars.  The only slight change is that, whereas Plan A was 'Gold Standard' throughout, Plan B will probably leave some room for later upgrades.  So, for example hubs will probably be reconditioned OE stuff rather than lightweight aluminium and brake pipes will now be kunifer and braided rather than top-of-the-range Goodridge throughout.  These type of decisions will be relatively small beer providing I'm out racing in 2012.

Anyway, I have done a bit to the car.  Roll bar mounts have been rather exercising my grey matter as the chassis was never really designed to have a full cage fitted. I think I've got it sussed now and have sent a couple of drawings away to get brackets water-jet cut and fabricated.

 I even spent a happy morning making models!
I've also started making the necessary mods to the chassis.  Hopefully my fabrication skills will improve with practice; it's taking me an age to cut and file tubes such that they are a half-decent fit!

I'm on the hunt for a suitable R1 motor and I plan to order my bodywork when I'm in Lancashire with work next week.  I still haven't fixed my welder.  MUST DO THAT THIS WEEK!

TC

Saturday, 5 November 2011

W E L D O N E

Before I attempt to construct a to-weld list, I must commend the team that I supported at the Birkett 6 Hour Relay Race as Silverstone on Saturday 29th October.  The guys were all very quick and ran faultlessly.  The result was a 'scratch' class win. Uber-Mega. I'm not going to give a blow-by-blow account of the day.  Others are much more able than I in this regard.  For example, click Dr Bob's linky-doo-dah on the right hand side if you are interested.  What I would say is that although its an enjoyable day, it's not easy - and I inevitably get cold and wet at some stage.  I actually hope that it's my last year 'taking part' as an administrator.  I'd best get some work done then...

I'm a bit fearful of rushing this list as it will hopefully be a really useful reference. Thankfully I can edit blog entries so here goes.  The list at this stage only covers the chassis itself and not things that hang-pff it.
  • Front ARB mounts
  • Radiator mounts
  • Oil cooler mounts
  • Engine mounts (taking inspiration from Wyn)
  • Electric reverse mounts - I'm a bit worried about clearance - more in a later post
  • Additional tube at bottom-front of the transmission tunnel
  • Gear shift pivot mount
  • Pedal box mount
  • Prop catchers x 2 
  • Some side impact protection (tbc)
  • Engine undertray Dzus tabs
  • Tunnel cover Dzus tabs
  • Rear undertray mounts/suppots
  • Front roll cage mounts - I'm not 100% sure how best to do these yet
  • Steering column mounts (top and bottom) - to incorporate paddle-shift mounts
  • Crotch strap mounts for 6-poiint harness
  • Fuel tank bobbins
  • Replace hindmost tubes with something capable of supporting roll cage rearward supports
  • Roll cage mounts for the above
  • Tow strap mounts
  • Rear ARB mounts (need to discuss with Dave at Track Developments)
  • Bracket for rear brake line & cable at rear of tunnel.
And that's before I've tried to fit the body and worked out if that needs anything different.  

I'd better get my welder fixed.

TC




Saturday, 8 October 2011

The good, the bad and the ugly...

Well, it seems that I'd not really thought through the axle-alignment / finessing job. Apparently you need the actual differential unit that's going to be used to make sure that the halfshafts are in the right position.  I'd foolishly assumed that the issue would revolve around the axle tubes themselves rather than the way that all the parts fit together.  The issue with this is that I haven't yet purchased the Quaife ATB diff - and due to the payment of a hefty deposit to secure our wedding venue/date I'm not in a position to do so this month.  Having apologised to Matt at Procomp, he's agreed to postpone the work.  Oops. 

I spent Wednesday and Thursday of this week with Martin Keenan in Rotherham essentially getting an introduction to MIG welding.  I wouldn't say that I was "born to weld" but I seemed to do okay.   My main issue is making sure that I can see the joint properly - it's all about getting my head in the right place.  I laid-down a fair amount of welds over the two days.  Apparently I used over a third of a big bottle of gas; Martin uses roughly the same amount to produce two chassis!

Here's my early practice runs:
These practice pieces were very useful and not only in their intended way.  They also made me realise how much heavier things can get if you have to weld something several times to get it structurally sound.  Right-first-time = lightness.

Anyway, by lunchtime on Day 2, I was producing welds like the two below with reasonable consistency.  They aren't wonderfully pretty but they don't break in the vice.  Result. 

While we all know that a 'bad workman always blames his tools,' Martin made it abundantly clear that a good reliable weld is a result of both man and machine doing what they should.  Unfortunately this means that I need to spend some money on my eBay welder.  
The bearings on the wire feed seem to be shot and as such it can be a bit hit and miss.  When it works though, it does so very well so it's worth sorting out.

In any case, I'm looking forward to getting stuck-in, something that I'll be able to do as my local workshop space is sorted at last.  I'll be in by the end of the month.  I'll make my next blog entry a welding to-do list.

Finally, the front wishbones from Dave at Track Developments are just about there with good levels of adjustment, more than sufficient freedom of movement and of course the intended geometry.
One needs to ignore the unnecessarily long bolts, odd spacers saving nyloc nuts (we are in a time of austerity after all!) and upside-down damper (borrowed.)

TC

Wednesday, 14 September 2011

Axle..errr...rater.

My axle casing, differential and half-shafts are being dropped-off with Matt and Ivan at Procomp Motorsport tomorrow evening to be given the once-over.  The casing should return nice and straight or possibly even with a smidgerino of desirable angle.

The search for a local workshop/garage with power is on; I may have tempted fate with Plan A in this regard.

TC  

Friday, 2 September 2011

Welding *slash* Wedding...

In an attempt to become a bit more self-sufficient, I've just bought myself a Cebora MIG welder.  I've also got two days of training booked in Rotherham with Martin Keenan of MK Engineering to learn how to use the thing.

In an attempt to add something pictorial to the previous post, here's the prototype wishbones - the top 'un is a touch too short and the bottom one really needs the rod-end to be cranked upwards a bit.  Dave at Track Developments has all this in hand.
Dave also accompanied me to Silverstone last weekend - we went to watch the (very wet) RGB race, to have a look at some of the cars and to have a chat with the builders - I wanted to give Dave a feel for what is involved and what people are doing.  As usual the RGBers were very accommodating and generous with their time.  My thanks go to them; particular thanks go to Della Rogers for the fabulous cake!

Oh and in other news, I asked Kate to marry me.  She said "Yes."  Brrrrrrrrrrraaaap brrrrrrrrraaap!  Err, I mean splendid news!

Sunday, 31 July 2011

Location Location Location...

The chassis has been lowered from the ceiling.  The wishbones are now in production and should be trial fitted this coming weekend.

It also looks like I may have found a new home for the build that has two major advantages:
  1. It's not 1hour+ away from home.
  2. It has power.
I don't think the move will happen until the autumn but it will make a huge difference in terms of the prospect of getting out next year.

All positive stuff.

Sunday, 3 July 2011

timsmnr.blogspot.com is no more...

... welcome to farcester.com

In an effort to refect the fact that I sold the MNR in 1947, I've now changed the title of the blog to farcester.com.  I think the new name embodies both my aspirations and my modus operandi.

TC