It's set to be an expensive weekend...
I'm of to Europe's biggest Kit Car show on Sunday to buy a lot of "stuff" to complete the build.
It could be costly!
In other news we have two 8-week old kittens. They've kept me out of the garage this week but I don't mind - they're very funny! We've called them Daff and Dill. (Born in spring and the Welsh national flower.)
Hmmm... the most random post yet. **Nice**
TC
Wednesday, 25 April 2007
A picture speaks a thousand words...
Below we have a nice picture proving that I can drill in straight lines (I'm getting better,) This is my rather lovely stainless braided fuel line.

Above and below you can see that the scuttle and one-piece tunnel cover have been trimmed to fit and now rest in place. The first Gulf logos are on too - I couldn't resist seeing how they'd look.
Tuesday, 10 April 2007
Kit Car Crisis (I am a Muppet!)....
I also learnt that the motor is best lifted in by three of you - two lifting and one guiding. Have had to touch-up the powdercoat as a result of that "lesson."
So all in all, I've had less haphazard weekends. On the plus-side, the fuel line is in and the diff is in place. Huzzah! Pics to follow.
Cheers
TC
Tuesday, 3 April 2007
An unhealthy habit and a new addition...
It all started to go ‘Pete Tong’ when I was drilling a piece of flat bar which would normally be used to mount the handbrake. The 1.5mm titanium bit I was using snapped – I was probably going too fast. Some of the drill-bit got lodged in the chassis and subsequent attempts to drill the bar resulted in blunt bits, a melted bit and a pleasant red-glow around the hole – well the garage is cold! A brand new Bosch bit finally did the business and normal service was resumed.

So why all the drilling? I finally thought it time to crack-on and fit the posh stainless braided brake lines. On the whole it went ok. The only real PITA is that I didn’t quite have enough slack to go as straight as I'd have liked in the front of the tunnel. The result (pictured) looks more like a Welsh mountain pass than a roman road and I shall dispise that part of the car for ever as a result… hopefully once the prop and motor are in though it won’t be so obvious.
It also took-up the area that I was intending to use to mount the regulator/rectifier so that’s now moved to the top of the tunnel. The brake lines are nearly all in. I just need to replace the Cleko fasteners with some ‘real’ rivets once they arrive.
That's real blood in the picture as well - Ouch!There’s been a new addition to the family – Julia’s twin sister gave birth to Francesca Scarlett Coleman a few weeks ago. I’d like to show you a picture but I can’t so here’s a picture of my baby in its cradle instead.

The weekend also saw some serious head scratching in terms of the wiring. I’ll say more when I know what the hell I’m doing! Parts either returned or on their way back to me this week include rear bearing carriers (thanks Derek) with new bearings fitted, a modified steering column (thanks Col – your welding shames most of the manufacturers!) and my freshly ceramic coated exhaust. How exciting is that?
Anyhoo – I’m off to do a bit more.
Friday, 23 March 2007
Slow and steady wins the.... Hillclimb?

Other work has focused on the wiring and things are starting to fall into place. I'm desperately trying to keep the wiring as neat as possible. The picture below shows the ECU, starter solenoid and Kliktronic controller bolted to the centre tunnel. I need to invest in some wire to get it all plumbed in now.

The new flexible brake lines have arrived from Merlin Motorsport and these will go in as soon as I can get hold of some 6.5mm p-clips.
I was originally hoping to have the engine in these weekend but a combination of 4 nights out on the town this week and lack of time to order bolts has meant that it'll have to wait. There's little chance to make great strides this weekend due to work commitments.
That said, I hope to get the remaining aluminium panel (scuttle/footwell tops) drilled and ready for fitting at a later date. I really need to sort out a powdercoater also!
If you want to see a similar car coming together more quickly, try here: http://mymnrvortx.blogspot.com/ Steve actually collected his kit a week later than me!
In any case, I'm enjoying my time in the garage!
TC
P.S. If you've never tried drinking cocktails named after cars and talking to another Petrolhead with a similar machine I can recommend it. Cheers!
Tuesday, 6 March 2007
Still no pictures and limited progress.
There's more parts to be sorted for powdercoating at the same time. These are:
- 2 x Fuel tank securing straps
- High level brake light mounting panel
- 2 x nose-cone supports
I'm contacting a couple of companies for quotes for the brake lines tomorrow. The ECU is mounted in the footwell. The position of the starter solenoid is marked. I am making some progress - honest Guv! On the subject of the wiring, I'm happy to do it as long as it's kept simple. For this reason, I'm not using the bike relay box or starter solenoid and am instead using a trusty Lucas-type. Where I'm not so good is on the size of cable to use for some of the wiring so I'll be taking advice from Vehicle Wiring Products when I order.
One final bit of good news - after much searching, I've located a source of new diff drain plugs. Mine is chewed to bits so this is a relief!
It's amazing what makes you happy when you're building one of these things.
Look after yourselves & each other... :p
TC
Sunday, 4 March 2007
I never said I'd make it easy for myself....
There's 3 of us that have all picked-up our MNR kits at around the same time. Needless to say, they other two guys have raced ahead. So why is this? Well, predominantly because I've made a few decisions that have slowed me down:
- The brake lines supplied with the kit have been sold and I'm going to run Goodridge flexible hoses throughout the car. The lines didn't fit anyway because of my line-lock set-up and I just don't like the look of copper pipes (I know - how daft does that sound!?) so with the help of a guy called Chris Mason (cheers Sir!) I've worked out what flexis I need. I haven't bitten the bullet yet because they're not exactly cheap!
- I once had a conversation with a guy who successfully builds and prepares race cars. He told me that he rivets panels on at inch intervals. Stupidly, I've taken his advice when it comes to my footwell panels. So whereas other MNR builders may use 30-odd rivets to affix the panels, I'm using exactly 100! Great! I've also decided to have the panels powdercoated so they're not on yet either.
On the positive side, I have done a fair amount of planning when it comes to the wiring, so that shouldn't be too difficult. I've also dropped my 4-2-1 exhaust off at Camcoat in Warrington to have it ceramic coated. This should a) Reduce under-bonnet temperatures and b) look cool.
So, that's about it for now. I'm off home to get back in the garage. I should have some pics on Tuesday when I'll explain what a wonderful device the Cleco fastner is.