Sunday, 19 April 2015

Getting tanked-up

At long-last the car is away having its tanks, water pipes and odds-and-sods fabricated.  
 

In all there are 9-items to be made or completed.
  1. The main fuel tank.
  2. The swirl pot housing the Yamaha pump
  3. Header tank
  4. Oil puke tank
  5. A small hard-pipe in the radiator top-hose
  6. A much more complicated hard-pipe in the bottom-hose
  7. An upper support for the oil cooler
  8. A stand-off support for the throttle cable adjuster
  9. A blanking plate/guide for the gear-change rod


And now we wait.  In the meantime I'm going to have a tidy-up.

TC