In all there are 9-items to be made or completed.
- The main fuel tank.
- The swirl pot housing the Yamaha pump
- Header tank
- Oil puke tank
- A small hard-pipe in the radiator top-hose
- A much more complicated hard-pipe in the bottom-hose
- An upper support for the oil cooler
- A stand-off support for the throttle cable adjuster
- A blanking plate/guide for the gear-change rod
And now we wait. In the meantime I'm going to have a tidy-up.
TC